Specially engineered to meet European standards (CCS2/CE/OCPP), these fast-charging solutions power public depots, charging hubs, and retail parking facilities across metropolitan Barcelona.
An industry-insider analysis of Catalonia's rapidly transitioning charging landscape, grid constraints, and municipal climate actions.
Discover our primary product families engineered for municipal fleets, commercial hubs, and energy storage integrations.
High-performance, lightweight DC chargers ranging from 7kW to 80kW, ideal for space-constrained urban depots and maintenance operations.
AC & DC Mobile 7kW - 80kW
From 60kW to 1440kW high-capacity configurations featuring dynamic power allocation, OCPP integration, and CE certifications.
High Power 60kW - 1440kW
Battery Energy Storage Systems integrating charging infrastructure from 60kWh to 2MkWh. Reduces demand charges and solves grid capacity constraints.
BESS Solutions 60kWh - 2MWhMIDA Group’s vertically integrated production delivers modules, connectors, and cabinets compliant with EU standards.




How MIDA Group combines direct Chinese component manufacturing with strict European compliance to optimize CAPEX and OPEX.
Sourcing systems directly from our factory in China reduces acquisition costs by 30% to 45% compared to local European assemblers, allowing rapid scaling of public charging tender bids.
Because we design and manufacture our own power modules and liquid-cooled connectors, we maintain precise control over hardware tolerance and thermal limits, minimizing field failures.
We configure the cabinet housings, local safety protections (like RCD Type B), and localized firmware configurations (OCPP profiles and billing APIs) specifically for Southern European utility grids.
Ensuring seamless integration with Endesa, Iberdrola, and local municipal distribution grids (DSOs).
Our charging systems undergo rigorous testing to secure CE marking, TUV approval, and RCM compliance. This ensures electrical safety, electromagnetic compatibility (EMC Class B), and mechanical integrity.
Compatible with major European back-end management platforms. Supports dynamic load balancing, real-time status reporting, remote configuration, and automatic firmware upgrades.
Equipped with integrated leakage current protection (6mA DC detection), over-temperature shutdown, surge protection (SPD Type 2), and active isolation monitoring to safeguard fleet assets.
How our DC charging systems solve fleet transitions across Catalonia's urban hubs.
To support the municipal electrification target for the Transports Metropolitans de Barcelona (TMB) fleet, our High-Power Pantograph Charger Systems (300kW to 600kW) allow fast top-up charging at bus terminals and overnight charging at depots.
Last-mile delivery and heavy-duty electric trucks moving cargo through the Port of Barcelona use our 600kW to 1080kW liquid-cooled split DC charging hubs, reducing turnaround times for logistics companies.
Integrating 120kW to 240kW DC chargers with integrated advertising screens allows commercial parking structures and shopping malls near Avinguda Diagonal to monetize charging services through digital advertising.
Read about our latest research and technical implementation guides for pantograph systems and heavy transport charging.
What are the advantages of an e-bus pantograph dome? In contrast to classic plug-in charging systems, e-bus pantograph systems offer automated connection, higher charging currents, and minimized wear and tear on heavy municipal fleets.
How long does it take to charge with an e-bus pantograph? The charging time depends on the battery capacity and the station's configuration, with high-power 600kW systems delivering charge cycles in under 10-15 minutes.
How to Install the Pantograph Up Charger System Dome for Electric Bus. Step-by-step structural guidelines for local civil engineering crews to construct overhead charging assemblies in transit yards.
Select high-performance fast chargers engineered for depot, public space, and heavy fleet application requirements.
Get answers to critical engineering, regulatory, and logistics queries for deploying high-power DC chargers in Europe.