Advanced power modules, connectors, and high-speed stations for the New Zealand market.
New Zealand is currently witnessing a paradigm shift in its transportation sector. With the government’s commitment to achieving net-zero emissions by 2050, the demand for robust, reliable, and high-speed electric vehicle (EV) charging infrastructure has surged. As a premier China Electric Charging Stations NZ Manufacturer, MIDA Group is at the forefront of this revolution, bridging the gap between advanced Chinese manufacturing prowess and New Zealand’s stringent environmental and safety standards.
The NZ market is unique due to its high proportion of renewable energy generation (hydro, wind, and geothermal). This makes the "well-to-wheel" carbon footprint of EVs in NZ significantly lower than in other nations. Key trends include:
Our 20kW-60kW standard and 40kW-125kW liquid-cooled modules achieve 96% peak efficiency, reducing operational costs for NZ network operators.
Integrated liquid cooling units (3.5kW to 72kW) ensure continuous high-power delivery even during thermal stress, extending cable and connector lifespan.
Bidirectional AC/DC power modules (up to 62.5kW) facilitate V2X ecosystems, allowing EVs to serve as mobile energy storage assets for the NZ grid.
Full adherence to IEC 62196, CCS1/CCS2, CHAdeMO, and AS/NZS standards, ensuring seamless interoperability and WorkSafe NZ compliance.

Our 600kW-1080kW liquid-cooled systems and inverted pantographs are designed for high-frequency bus routes in cities like Auckland and Wellington.
Energy storage charging stations (60kWh to 2MWh) allow operators to bypass grid constraints by storing off-peak solar energy for peak EV charging.
Wall-mounted and mobile DC chargers (20kW-80kW) provide the flexibility required for logistics hubs and rental car fleets.
Comprehensive ecosystem from cable to megawatt stations.
Entering the New Zealand market requires more than just high-quality hardware. It requires a deep understanding of AS/NZS 3000:2018 electrical standards and the WorkSafe NZ guidelines for EV charging safety. MIDA Group ensures that all exported products undergo rigorous testing to meet these specific requirements.
MTBF (Mean Time Between Failures) exceeds 50,000 hours for our power modules, crucial for remote NZ locations.
Standard OCPP 1.6J and 2.0.1 support, allowing NZ network providers to integrate with any back-end management software.
OEM/ODM services for NZ enterprises wanting to brand their own charging infrastructure solutions.