Explore MIDA Group’s OEM/ODM fast-charging portfolio engineered for ultra-reliability, dynamic power dispatch, and heavy-duty commercial operation.
Vertical Integration from Raw Conductors and SiC Power Modules to Megawatt Charging Depots
Shanghai Mida Cable Group Ltd. operates through its specialized, wholly owned subsidiaries: Shanghai Mida EV Power Co., Ltd., Shenzhen Mida EV Power Co., Ltd., and Shanghai Mida New Energy Co., Ltd. As a premier China CCS1 DC charger station manufacturer and global tier-1 technology provider, MIDA Group integrates complete R&D, high-precision manufacturing, and stringent quality validation under one unified enterprise framework.
Mida Cable manufactures a comprehensive range of EV charging cables, including 16A–80A J1772 cables, 16A–63A IEC 62196-2 Type 2 cables, and heavy-duty DC fast charging cables: CCS1 (80A–500A), CCS2 (125A–1000A), CHAdeMO (125A–300A), GBT (200A–1000A), and NACS connectors (250A–600A).
MIDA EV Power produces a full lineup of EV charging stations, such as 7kW–50kW mobile chargers, 3.6kW–7.2kW portable DC chargers, 360kW–1440kW split-type DC fast chargers, 20kW–50kW wall-mounted DC chargers, and 60kW–480kW floor-standing DC fast charging stations.
MIDA New Energy specializes in EV charger power modules, offering 20kW–60kW standard modules, 40kW–125kW liquid-cooled modules, 30kW–62.5kW bidirectional modules, and 20kW–45kW V2G charging modules.
Quantifiable performance figures supporting global Charge Point Operators (CPOs), fleet networks, and utility integrators.
Understanding the Combined Charging System Type 1 (SAE J1772 Combo) Standard for High-Reliability Deployment
Our CCS1 DC fast charger stations utilize hardware-level Power Line Communication (PLC) over Control Pilot (CP) lines. Supporting ISO 15118-2/20, MIDA stations enable seamless Plug & Charge (PnC) capabilities, encrypted digital handshakes, and smart grid bi-directional V2G communication.
By leveraging Silicon Carbide (SiC) power MOSFET modules (30kW, 40kW, 50kW, and 60kW), MIDA CCS1 charging terminals achieve ultra-high efficiency (>96.5%) with a power factor exceeding 0.99. Low Total Harmonic Distortion (THD < 3%) safeguards localized utility grids from harmonic pollution.
Integrated solid-state matrix switching matrix allows dual-gun and multi-dispenser CCS1 chargers to dynamically reallocate power modules in 20kW/30kW increments. This guarantees maximum charging speed regardless of vehicle battery state-of-charge (SoC) profiles.
Extensive Certification Matrix Ensuring Rapid Interconnection and Grid Security
| Standard / Regulation | Technical Scope & Purpose | MIDA CCS1 Station Compliance Standard |
|---|---|---|
| UL 2202 / UL 2594 | Standard for Electric Vehicle (EV) Charging System Equipment (DC Fast Chargers & Safety Devices) | Certified insulation safety, short-circuit protection, ground fault circuit interruption (GFCI), and thermal cutoffs. |
| NEC Article 625 | National Electrical Code guidelines governing EV supply equipment installation & wiring safety | NEMA 3R / IP54 rated heavy-gauge galvanized steel enclosures; integrated emergency stop controls. |
| FCC Part 15 Class A | Electromagnetic Interference (EMI) & Electromagnetic Compatibility (EMC) compliance | Fully shielded power modules and high-frequency noise filters preventing local telecom interference. |
| CTEP / NTEP Metering | California Type Evaluation Program & National Type Evaluation Program for Commercial Billing | Embedded DC revenue-grade meters with digital display windows certified for precise kWh commercial billing. |
| OCPP 1.6-J / 2.0.1 | Open Charge Point Protocol for back-end software management, telemetry, and billing control | Pre-validated compatibility with major CPO platforms (AmpUp, ChargeLab, Greenlots/Shell Recharge, Driivz). |
Learn about our specialized product categories to select the exact engineering configuration for your operational requirements.
Why Tier-1 Global Procurement Officers Partner with Shanghai Mida Cable Group for CCS1 Deployment
Unlike regional assemblers who rely on third-party cables and sub-assemblies, MIDA controls the entire supply chain. From processing high-purity copper conductors in our cable facilities to manufacturing liquid-cooling hoses, SiC converter boards, and sheet-metal enclosures, our internal synergy reduces BOM (Bill of Materials) costs by 25–35% while maintaining strict quality consistency.
CCS1 liquid-cooled cables and stations undergo rigorous environmental stress testing. Operating under extreme ambient temperatures (-40°C to +55°C), our liquid cooling modules utilize non-conductive, low-viscosity coolant lines that allow continuous 500A output without thermal throttling, guaranteeing fast turnarounds for commercial fleet depots.
For CPOs, retailers, and fuel station brands looking to establish market presence, MIDA offers comprehensive OEM customization. This includes custom vinyl branding, powder-coated exterior colors, screen-printed corporate logos, tailored UX/UI touchscreen interfaces (7-inch to 55-inch advertising displays), and integrated POS credit card readers (Nayax, Ingenico).
Our dedicated R&D interoperability labs test real-time communication protocols across hundreds of EV models—including heavy-duty electric trucks (Class 8), transit buses, delivery vans, and passenger vehicles (Tesla via NACS/CCS1 adapters, Ford F-150 Lightning, Rivian, GM Ultium platforms). This minimizes field activation errors and guarantees plug-and-play capability.
Engineered Configurations Tailored to Commercial Real Estate, Transit Hubs, and Off-Grid Systems
Recommended Setup: 180kW to 360kW Floor-Mounted Dual CCS1 Stations or 600kW Liquid-Cooled Split Systems.
Enables ultra-fast charging (15–20 minutes) for long-distance drivers. Features credit card POS terminals, 4G cloud gateway, and dynamic power distribution between dual connectors.
Recommended Setup: 120kW to 240kW Heavy-Duty CCS1 Charging Piles with overhead cable management systems.
Designed for overnight depot charging and rapid daytime top-ups. Fully compatible with fleet management backends via OCPP 2.0.1 for automated energy dispatch and peak-shaving.
Recommended Setup: 120kW/200kWh to 480kW/1MWH Smart BESS Charging Stations.
Combines lithium iron phosphate (LFP) battery storage with DC ultra-fast chargers. Eliminates grid transformer upgrade costs by buffering grid power during peak demand hours.
In-Depth Technical Answers for Procurement Managers, Electrical Engineers, and CPO Operators
Stay informed with technical updates on electric bus charging infrastructure, heavy-duty pantograph systems, and fleet electrification.
Custom OEM Solutions Available: Wall-Mounted, Pedestal, Mobile BESS & Ultra-Fast Split Charging Systems