Pre-integrated Battery Energy Storage & Ultra-Fast Charger systems designed to bypass peak capacity limits on EirGrid and ESB Networks.
As Ireland accelerates its transition toward electric vehicles in alignment with the National Climate Action Plan (targeting 950,000 EVs on Irish roads by 2030), the demands on EirGrid and ESB Networks have reached an inflection point. The geographic concentration of heavy energy demand in Dublin and major commercial hubs along the M50 corridor, coupled with high grid connection charges and multi-year delays for sub-station upgrades, presents a major bottleneck for logistics depots, retail hubs, and highway fast-charging networks. The integration of Battery Energy Storage Systems (BESS) alongside DC ultra-fast chargers offers an elegant, zero-wait capacity upgrade path.
“Using locally integrated battery reserves enables charge point operators (CPOs) in Ireland to deliver up to 320kW or 480kW of ultra-fast DC charging capacity even when the local grid feed is limited to just 50kVA. This significantly reduces Maximum Import Capacity (MIC) penalties and eliminates grid upgrade delays.”
Ireland's island grid topology is highly sensitive to wind fluctuations. Our intelligent BESS charging stations act as bi-directional grid assets. They charge dynamically during periods of abundant wind energy generation (when pricing is low or negative under Irish smart tariffs) and discharge during peak demand periods. This process—known as Peak Shaving and Load Leveling—insulates commercial operators from volatile electricity tariffs and ensures uninterrupted high-power charging for heavy commercial fleets and transit buses.
State-of-the-art power distribution and energy storage products optimized for commercial and industrial installation.
Shanghai Mida Cable Group Ltd. operates through its wholly owned subsidiaries: Shanghai Mida EV Power Co., Ltd., Shenzhen Mida EV Power Co., Ltd., and Shanghai Mida New Energy Co., Ltd.
Mida Cable manufactures a comprehensive range of EV charging cables, including 16A–80A J1772 cables, 16A–63A IEC 62196-2 Type 2 cables, and DC fast charging cables: CCS1 (80A–500A), CCS2 (125A–1000A), CHAdeMO (125A–300A), GBT (200A–1000A), and NACS connectors (250A–600A).
MIDA EV Power produces a full lineup of EV charging stations, such as 7kW–50kW mobile chargers, 3.6kW–7.2kW portable DC chargers, 360kW–1440kW split-type DC fast chargers, 20kW–50kW wall-mounted DC chargers, and 60kW–480kW floor-standing DC fast charging stations.
MIDA New Energy specializes in EV charger power modules, offering 20kW–60kW standard modules, 40kW–125kW liquid-cooled modules, 30kW–62.5kW bidirectional modules, and 20kW–45kW V2G charging modules.
Understanding user intent and application-specific parameters is key to achieving project profitability for Irish CPOs (Charge Point Operators). MIDA's high-efficiency systems are specifically tailored for several local Irish contexts:
All MIDA charging stations and cables imported to Ireland comply with EU directives and national regulations. We hold comprehensive CE certifications and comply with the safety and grid compatibility requirements under EN 61851-1, ISO 15118 (Plug & Charge), and EirGrid/ESB Distribution Codes. Furthermore, our BESS units use premium Lithium Iron Phosphate (LiFePO4) chemistry combined with multi-layer BMS (Battery Management Systems) and integrated aerosol fire suppression systems for maximum safety in public and industrial environments.
MIDA's vertical integration covers everything from heavy-duty charging cables to advanced bidirectional modules.
Explore our highly integrated battery storage systems designed to maximize charge performance and minimize operational costs.
Complete project integration with high-output and mobile battery reserves to power high-speed charging infrastructures.
MIDA Group's manufacturing process relies on Industry 4.0 workflows, ensuring highly reliable, consistent product quality. Our smart factories utilize automated production and testing rigs to monitor every stage of manufacturing—from PCB assembly to full load tests. Our vertical supply chain integration allows us to design, manufacture, and assemble core elements internally, including charging cables, liquid-cooled connectors, and high-performance power modules. This control over the supply chain results in stable lead times, reduced shipping disruptions, and high price-to-performance ratios for our global partners.
We source raw materials directly and execute high-precision cable extrusion, connector assembly, and software programming in our own facilities. This direct control ensures that even custom configurations (such as specific connector lengths, customized branding, or unique communications setups like local OCPP links for Irish servers) can be shipped quickly and safely.
Stay informed about current technologies and engineering developments in the global EV and public transit markets.
What are the advantages of an e-bus pantograph dome? In contrast to classic plug-in charging systems, e-bus pantograph systems offer automated, high-power depot charging...
How long does it take to charge with an e-bus pantograph? The charging time depends on the battery capacity and the grid connection, with pantograph charging often completed in minutes...
How to Install the Pantograph Up Charger System Dome for Electric Bus. Installing a “Pantograph Up” system requires careful site assessment, stable overhead framing, and integration with local power distribution...
Get answers to common technical, logistics, and installation queries from our engineering team.